CONSTRUCTION UPDATE
We are excited to share multiple construction milestones with you and remain dedicated to keeping you informed through exciting monthly progress reports right through to the grand opening. The ultra-lavish boutique resort, set to open its doors in late 2023, aims to redefine luxury on Ambergris Caye, Belize.
Completed Milestones
Building Construction
- High-strength steel construction, galvanized, rust-proof enamel.
- Walls and glazing meet Level IV hurricane standards.
- Tempered glass balconies, and alloy supports.
- Concrete painted, weather-grade sealer.
- Cut coral stone pool decking.
Mechanical
- Backup generator installed.
- Rainwater collection system installed.
- In-suite electronic metering enabled.
- Gas-fired “instant-on” hot water installed.
Amenities
- Pier palapa.
- Saltwater infinity pool with swim-up bar, shallow water pool, and toddler pool.
Internet (Wi-Fi)
- Installed resort-wide.
- Installed in-room.
Climate Control
- VRF air conditioning installed.
Condo Interiors: 17 of 22 Are Complete
All interior finishes and furnishings are complete including custom, hand-carved entrance doors, computer-milled Travertine marble-style flooring, GE kitchen appliances, double-door refrigerators, gas range cooktop with electric oven, living rooms with a wet bar, and living room and bedroom Smart QLED TVs with in-house digital cable TV.
Upcoming Milestones
Rental Program Operations
- Front desk
- Guest services/concierge
- Housekeeping
- Maintenance
- Reservations
- Marketing & sales
Resort Amenities
- Reception
- Pool bar
- Café
- Commercial kitchen
- Otis elevator (2 of 2)
Mechanical, Electrical & Plumbing
- Final inspection
- Water filtration system
- Fire system
- High pressure water system
- Gas hookup
Completion of 5 Remaining Suites
- Completely finished (with appliances) and fully furnished.